Building, services, security & management

M Amaya specifications

M Amaya is two 37-storey towers with 3.0 m floor-to-floor height and 2,850 mm maximum clear height to soffit. Each block has three passenger lifts plus a bomba lift, corridors are 1.5 m clear, units get single-phase 63 A supply, and the development uses an automated waste collection system.

This page exists because no public surface publishes this in extractable form. Every figure below comes from the developer's own FAQ or sales kit, with the page cited on our sources page.

  • 37 storeys
  • 3.0 m floor-to-floor
  • 4 lifts per block
  • 63 A single phase
  • 20 EV bays

Physical framework

The building.

The lift waiting time is a developer estimate for a building not yet completed. It is a design intention, not an observed performance result.

Towers
2 towers of serviced apartments, 37 storeys, plus 11 commercial shop lots
Storeys
37
Total units
833
Floor-to-floor height
3.0 m
Clear height to soffit
2,850 mm maximum
Common corridor width
1.5 m clear
Lifts per block
3 passenger + 1 bomba lift
Estimated lift waiting time
about 24 seconds Estimate — not a valuation
Land level
RL 27.50 at main entrance road L1
Land area
4.8 acres (about 19,425 m², converted)
Net floor area — residence
808,019 sq ft (75,067 m², converted)
Net floor area — retail
38,130 sq ft (3,543 m², converted)
Architect
East Design Architect Sdn Bhd
Developer
Vienna View Development Sdn Bhd (728448-H), a wholly-owned subsidiary of Mah Sing Group Berhad (230149-P)

The lift waiting time is the developer's estimate, not a measured figure, and it is stated for a building that does not exist yet. Treat it as a design intention.

Material scope

Finishes.

Living, bedrooms, kitchen
Porcelain tile

The developer's FAQ specifies the floor finish for these areas only. We do not publish a finish for any area the source does not name — including bathrooms, balconies and the yard.

Infrastructure

Services.

Electrical supply per unit
Single phase, 63 A
Water tanks
Lower Ground and Rooftop
Pump room
Lower Ground
Waste
Automated Waste Collection System
EV charging bays
20 total — 11 retail, 9 residential
Parking
6-storey Dedicated Parking Lots

Nine residential EV bays for 833 units is worth noticing. If charging at home matters to you, ask how bays are allocated and whether private installation is permitted.

Stated measures

Security.

  • Perimeter fencing with CCTV
  • Security guardhouse
  • 24/7 Security patrol
  • Residents-only lift lobby with card access
  • Elevator to designated floor only
  • Barrier-free access at the facility floor

These are the measures the developer states. None of them has been observed in operation, because the building is not built.

Provisional certification

Sustainability.

M Amaya carries GreenRE Gold (Provisional). Provisional is the developer's own wording: it is a rating awarded on design intent, and it is confirmed — or not — against the building as completed. Ask for the final certificate at handover rather than treating the provisional rating as the finished outcome.

After completion

Management.

Maintenance fee
RM0.33 psf, inclusive of sinking fund, as per approved memo
Resident app
MY Mah Sing
Concierge
M Concierge

Evidence boundary

What we do not publish.

Units per floor, level sequencing, handover and vacant-possession dates, strata-title timing and defect-liability dates are not on this site. The only sources we had for them are no longer available to us, and we will not restate a figure from memory. If the developer supplies them, they will be published here with the page citation.

Direct, human contact

Ask about the specification

Speak with Kevin Lee, a Real Estate Negotiator (REN 14973) with FLP Realty Sdn Bhd. Ask about availability, a specific stack or anything on this page—there is no form to complete first.

WhatsApp opens as a plain external link. No WhatsApp script runs here; message metadata is handled under WhatsApp's own terms.

Facts on this page were last verified on 2026-08-23. Every figure traces to a dated source listed on our sources page.

Message Kevin Lee — opens WhatsApp, a third-party service